Thunder Creek (20INR0156)

Thunder Creek is a 200.0 MW wind interconnection project in Hardeman, Texas with a current status of withdrawn. It is proposed to connect at 1430 Graham 345kV.

200.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameThunder Creek
Queue ID20INR0156
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity200.0 MW
StateTexas
CountyHardeman
Point of interconnection1430 Graham 345kV
Requested (queue) date2018-08-16
Proposed in-service date2021-12-01
Operational date
Withdrawn date2019-02-04
DeveloperNextera
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata