Tierra Bonita Solar (21INR0424)

Tierra Bonita Solar is a 306.9 MW solar interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 844 Nevilesw – 134905 Greaswod 345 kV.

306.9 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameTierra Bonita Solar
Queue ID21INR0424
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity306.9 MW
StateTexas
CountyPecos
Point of interconnection844 Nevilesw – 134905 Greaswod 345 kV
Requested (queue) date2019-10-14
Proposed in-service date2024-12-26
Operational date2024-12-31
Withdrawn date
DeveloperGreasewood BESS, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata