Tiger Wind (20INR0153)

Tiger Wind is a 300.0 MW wind interconnection project in Taylor, Texas with a current status of withdrawn. It is proposed to connect at 68000 West Shackelford 345kV.

300.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameTiger Wind
Queue ID20INR0153
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity300.0 MW
StateTexas
CountyTaylor
Point of interconnection68000 West Shackelford 345kV
Requested (queue) date2018-10-09
Proposed in-service date2022-12-01
Operational date
Withdrawn date2021-03-18
DeveloperNextera
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.