Timmerman Power Plant Phase 2 (25INR0503)
Timmerman Power Plant Phase 2 is a 188.4 MW gas interconnection project in Caldwell, Texas with a current status of active. It is proposed to connect at 7041 John Dumas 345kV.
188.4 MWCapacity
ActiveStatus
ERCOTMarket
GasTechnology
Project facts
| Canonical name | Timmerman Power Plant Phase 2 |
|---|---|
| Queue ID | 25INR0503 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Gas |
| Capacity | 188.4 MW |
| State | Texas |
| County | Caldwell |
| Point of interconnection | 7041 John Dumas 345kV |
| Requested (queue) date | 2023-09-22 |
| Proposed in-service date | 2026-05-29 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Lower Colorado River Authority |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata