Timmerman Power Plant Phase 2B is a 94.2 MW gas interconnection project in Caldwell, Texas with a current status of active. It is proposed to connect at 7041 John Dumas 345kV.

94.2 MWCapacity
ActiveStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameTimmerman Power Plant Phase 2B
Queue ID26INR0735
Statusactive
Source statusactive
MarketERCOT
TechnologyGas
Capacity94.2 MW
StateTexas
CountyCaldwell
Point of interconnection7041 John Dumas 345kV
Requested (queue) date2025-10-21
Proposed in-service date2026-08-14
Operational date
Withdrawn date
DeveloperLower Colorado River Authority
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata