TMLP Landfill Solar is a 3.0 MW solar interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at TMLP Dist Feeder 1841.32 Station 18 13.8kV/115kV.

3.0 MWCapacity
WithdrawnStatus
SEMAMarket
SolarTechnology

Project facts

Canonical nameTMLP Landfill Solar
Queue ID1581
Statuswithdrawn
Source statusW
MarketSEMA
TechnologySolar
Capacity3.0 MW
StateMassachusetts
CountyBristol
Point of interconnectionTMLP Dist Feeder 1841.32 Station 18 13.8kV/115kV
Requested (queue) date2024-07-29
Proposed in-service date2025-01-25
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata