TOCE TX BESS 2 is a 523.4 MW battery interconnection project in Wharton, Texas with a current status of active. It is proposed to connect at Tap 44200 Hillje - 44000 WA Parrish 345 kV.

523.4 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameTOCE TX BESS 2
Queue ID26INR0334
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity523.4 MW
StateTexas
CountyWharton
Point of interconnectionTap 44200 Hillje - 44000 WA Parrish 345 kV
Requested (queue) date2024-02-02
Proposed in-service date2027-08-01
Operational date
Withdrawn date
DeveloperTOCE TX BESS 4, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata