Todds Tavern- Spotsylvania/Goldsdale 115kV is a 50.0 MW battery interconnection project in Spotsylvania, Virginia with a current status of withdrawn.
50.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Todds Tavern- Spotsylvania/Goldsdale 115kV |
|---|---|
| Queue ID | AH1-251 - moved to TC2 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 50.0 MW |
| State | Virginia |
| County | Spotsylvania |
| Point of interconnection | — |
| Requested (queue) date | 2021-09-09 |
| Proposed in-service date | 2028-12-31 |
| Operational date | — |
| Withdrawn date | 2026-09-30 |
| Developer | — |
| Utility / transmission owner | Dominion |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-01 | proposed_online_date | — | 2028-12-31 | medium |
| 2026-10-01 | withdrawn_date | — | 2026-09-30 | high |
| 2026-10-01 | status | active | withdrawn | high |
| 2026-07-29 | new_project | — | active | high |
Explore related data
Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata