Tolk 345 kV Substation (GEN-2023-240)

Tolk 345 kV Substation is a 550.0 MW solar interconnection project in Bailey, Texas with a current status of withdrawn. It is proposed to connect at Tolk 345 kV Substation.

550.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTolk 345 kV Substation
Queue IDGEN-2023-240
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity550.0 MW
StateTexas
CountyBailey
Point of interconnectionTolk 345 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2030-12-31
Operational date
Withdrawn date2024-04-22
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.