Bailey County, Texas — Interconnection Projects
The interXdata warehouse tracks 11 interconnection projects in Bailey, Texas, representing 2,313 MW of requested capacity.
11Total projects
0Active
3Operational
8Withdrawn
2,313 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 1,308 MW |
| Wind | 4 | 781 MW |
| Battery | 2 | 224 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Tolk 345 kV Substation | GEN-2023-240 | Solar | 550.0 MW | withdrawn | Bailey, Texas |
| Tolk - Crossroads 345 kV line | GEN-2024-109 | Wind | 400.5 MW | operational | Bailey, Texas |
| Roosevelt-Tolk 230kV | GEN-2017-190 | Solar | 300.3 MW | withdrawn | Bailey, Texas |
| Roosevelt - Tolk 230 kV line tap | GEN-2023-195 | Solar | 250.0 MW | withdrawn | Bailey, Texas |
| Roosevelt - Tolk 230 kV line tap | GEN-2023-196 | Battery | 150.0 MW | withdrawn | Bailey, Texas |
| Tolk - Yoakum 230kV | GEN-2013-027 | Wind | 148.4 MW | operational | Bailey, Texas |
| Blue Cloud Wind Energy LLC | 60270_WT1 | Wind | 148.4 MW | operational | Bailey, Texas |
| Bailey County 115kV | GEN-2016-078 | Solar | 108.0 MW | withdrawn | Bailey, Texas |
| Tap 230kV Roosevelt-Tolk Line | GEN-2016-089 | Solar | 100.0 MW | withdrawn | Bailey, Texas |
| Lariat 69kV | GEN-2014-009 | Wind | 83.7 MW | withdrawn | Bailey, Texas |
| Roosevelt-Tolk 230kV line | GEN-2018-085 | Battery | 74.0 MW | withdrawn | Bailey, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Bailey County.
Start tracking with interXdata