Tolk - Crossroads 345 kV line (GEN-2024-109)

Tolk - Crossroads 345 kV line is a 400.5 MW wind interconnection project in Bailey, Texas with a current status of operational. It is proposed to connect at Tolk - Crossroads 345 kV line.

400.5 MWCapacity
OperationalStatus
TXMarket
WindTechnology

Project facts

Canonical nameTolk - Crossroads 345 kV line
Queue IDGEN-2024-109
Statusoperational
Source statusDISIS STAGE
MarketTX
TechnologyWind
Capacity400.5 MW
StateTexas
CountyBailey
Point of interconnectionTolk - Crossroads 345 kV line
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2030-12-31
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata