Torrecillas Wind is a 300.5 MW wind interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at 161252, 161301 Torrecillas 34.5kV.

300.5 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameTorrecillas Wind
Queue ID14INR0045
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity300.5 MW
StateTexas
CountyWebb
Point of interconnection161252, 161301 Torrecillas 34.5kV
Requested (queue) date2013-01-29
Proposed in-service date2019-11-30
Operational date2019-11-07
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata