Tortolas BESS (23INR0072)
Tortolas BESS is a 50.3 MW other interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at 39030 Alvin 138kV.
50.3 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Tortolas BESS |
|---|---|
| Queue ID | 23INR0072 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Other |
| Capacity | 50.3 MW |
| State | Texas |
| County | Brazoria |
| Point of interconnection | 39030 Alvin 138kV |
| Requested (queue) date | 2020-08-03 |
| Proposed in-service date | 2025-01-07 |
| Operational date | 2025-01-06 |
| Withdrawn date | — |
| Developer | BRP Tortolas BESS LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata