TRANSFER RIDGE WIND (976)

TRANSFER RIDGE WIND is a 60.0 MW wind interconnection project in Butte, California with a current status of withdrawn. It is proposed to connect at TABLE MTN-RIO OSO 230 KV Line.

60.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameTRANSFER RIDGE WIND
Queue ID976
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity60.0 MW
StateCalifornia
CountyButte
Point of interconnectionTABLE MTN-RIO OSO 230 KV Line
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2014-02-25
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.