Tres Margaritas Solar (24INR0088)

Tres Margaritas Solar is a 61.0 MW solar interconnection project in Dimmit, Texas with a current status of withdrawn. It is proposed to connect at Tap 138kV 8613 Big Wells – 8212 Dilley Switching Station.

61.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameTres Margaritas Solar
Queue ID24INR0088
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity61.0 MW
StateTexas
CountyDimmit
Point of interconnectionTap 138kV 8613 Big Wells – 8212 Dilley Switching Station
Requested (queue) date2021-07-12
Proposed in-service date2026-06-30
Operational date
Withdrawn date2025-02-06
DeveloperGransolar Texas Twenty Two
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata