Tri-County Solar (19INR0017)

Tri-County Solar is a 177.8 MW solar interconnection project in Crane, Texas with a current status of suspended.

177.8 MWCapacity
SuspendedStatus
CraneMarket
SolarTechnology

Project facts

Canonical nameTri-County Solar
Queue ID19INR0017
Statussuspended
Source status—
MarketCrane
TechnologySolar
Capacity177.8 MW
StateTexas
CountyCrane
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—suspendedhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata