TRIFECTA Gas (26INR0183)

TRIFECTA Gas is a 453.0 MW gas interconnection project in Midland, Texas with a current status of active. It is proposed to connect at Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01.

453.0 MWCapacity
ActiveStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameTRIFECTA Gas
Queue ID26INR0183
Statusactive
Source statusactive
MarketERCOT
TechnologyGas
Capacity453.0 MW
StateTexas
CountyMidland
Point of interconnectionTap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01
Requested (queue) date2023-06-28
Proposed in-service date2030-02-11
Operational date
Withdrawn date
DeveloperNET Power LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata