TUMBLEWEED SOLAR GENERATING STATION (330)

TUMBLEWEED SOLAR GENERATING STATION is a 33.0 MW gas interconnection project in Los Angeles, California with a current status of withdrawn. It is proposed to connect at Antelope-Calcement 66kV line.

33.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameTUMBLEWEED SOLAR GENERATING STATION
Queue ID330
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity33.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionAntelope-Calcement 66kV line
Requested (queue) date2008-03-31
Proposed in-service date
Operational date
Withdrawn date2008-11-26
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.