Turtle Creek 345 kV Substation Expansion (GEN-2022-044)

Turtle Creek 345 kV Substation Expansion is a 80.0 MW battery interconnection project in Wayne And Pierce, Nebraska with a current status of withdrawn. It is proposed to connect at Turtle Creek 345 kV Substation Expansion.

80.0 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameTurtle Creek 345 kV Substation Expansion
Queue IDGEN-2022-044
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity80.0 MW
StateNebraska
CountyWayne And Pierce
Point of interconnectionTurtle Creek 345 kV Substation Expansion
Requested (queue) date2022-06-23
Proposed in-service date2026-12-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.