Twin Rivers-Windsor 34.5kV (W3-078)

Twin Rivers-Windsor 34.5kV is a 13.0 MW solar interconnection project in Mercer, New Jersey with a current status of withdrawn.

13.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameTwin Rivers-Windsor 34.5kV
Queue IDW3-078
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity13.0 MW
StateNew Jersey
CountyMercer
Point of interconnection—
Requested (queue) date2010-09-30
Proposed in-service date2014-09-01
Operational date—
Withdrawn date2014-10-21
Developer—
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.