Tyler Rose Power Plant 2 (29INR0336)

Tyler Rose Power Plant 2 is a 398.2 MW gas interconnection project in Grimes, Texas with a current status of active. It is proposed to connect at Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek.

398.2 MWCapacity
ActiveStatus
GrimesMarket
GasTechnology

Project facts

Canonical nameTyler Rose Power Plant 2
Queue ID29INR0336
Statusactive
Source statusSS Started, FIS Started, No IA
MarketGrimes
TechnologyGas
Capacity398.2 MW
StateTexas
CountyGrimes
Point of interconnectionTap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek
Requested (queue) date2026-05-13
Proposed in-service date2029-12-01
Operational date
Withdrawn date
DeveloperProEnergy Services
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.