ULTRAPOWER CHINESE STATION BESS (1116)

ULTRAPOWER CHINESE STATION BESS is a 10.0 MW battery interconnection project in Tuolumne, California with a current status of operational. It is proposed to connect at Melones-Curtis 115 kV Line.

10.0 MWCapacity
OperationalStatus
NorthernMarket
BatteryTechnology

Project facts

Canonical nameULTRAPOWER CHINESE STATION BESS
Queue ID1116
Statusoperational
Source statusCOMPLETED
MarketNorthern
TechnologyBattery
Capacity10.0 MW
StateCalifornia
CountyTuolumne
Point of interconnectionMelones-Curtis 115 kV Line
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata