Ulysses Solar (21INR0253)

Ulysses Solar is a 151.2 MW solar interconnection project in Coke, Texas with a current status of operational. It is proposed to connect at 60072 Odysseus Substation 345 kV.

151.2 MWCapacity
OperationalStatus
CokeMarket
SolarTechnology

Project facts

Canonical nameUlysses Solar
Queue ID21INR0253
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCoke
TechnologySolar
Capacity151.2 MW
StateTexas
CountyCoke
Point of interconnection60072 Odysseus Substation 345 kV
Requested (queue) date2019-01-25
Proposed in-service date
Operational date2027-03-02
Withdrawn date
DeveloperBNB Renewable Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata