Umbra BESS II (24INR0438)

Umbra BESS II is a 149.6 MW battery interconnection project in Franklin, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 1695 Monticello -11699 Woodard.

149.6 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameUmbra BESS II
Queue ID24INR0438
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity149.6 MW
StateTexas
CountyFranklin
Point of interconnectiontap 345kV 1695 Monticello -11699 Woodard
Requested (queue) date2023-06-27
Proposed in-service date2027-04-28
Operational date
Withdrawn date2025-12-17
DeveloperSaddle House Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata