Umbra Solar II (24INR0437)

Umbra Solar II is a 344.7 MW solar interconnection project in Franklin, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 1695 Monticello -11699 Woodard.

344.7 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameUmbra Solar II
Queue ID24INR0437
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity344.7 MW
StateTexas
CountyFranklin
Point of interconnectiontap 345kV 1695 Monticello -11699 Woodard
Requested (queue) date2023-06-27
Proposed in-service date2027-04-28
Operational date
Withdrawn date2025-12-17
DeveloperSaddle House Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.