Underwood - Wayside 230 kV (GEN-2017-064)

Underwood - Wayside 230 kV is a 110.0 MW solar interconnection project in Oglala And Custer Counties, South Dakota with a current status of withdrawn. It is proposed to connect at Underwood - Wayside 230 kV.

110.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameUnderwood - Wayside 230 kV
Queue IDGEN-2017-064
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity110.0 MW
StateSouth Dakota
CountyOglala And Custer Counties
Point of interconnectionUnderwood - Wayside 230 kV
Requested (queue) date2017-05-08
Proposed in-service date
Operational date
Withdrawn date2021-11-29
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata