USS Fruita Solar LLC CSG (66432_USGBS)

USS Fruita Solar LLC CSG is a 2.0 MW solar interconnection project in Mesa, Colorado with a current status of operational.

2.0 MWCapacity
OperationalStatus
WACMMarket
SolarTechnology

Project facts

Canonical nameUSS Fruita Solar LLC CSG
Queue ID66432_USGBS
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologySolar
Capacity2.0 MW
StateColorado
CountyMesa
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-05-01
Withdrawn date
Developer
Utility / transmission ownerUnited States Solar Corporation

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata