UT Queue Project PIS031 — Solar in Emery, Utah

UT Queue Project PIS031 — Solar in Emery, Utah is a 199.0 MW solar interconnection project in Emery, Utah with a current status of withdrawn. It is proposed to connect at Camp Williams-Four Corners transmission line.

199.0 MWCapacity
WithdrawnStatus
UTMarket
SolarTechnology

Project facts

Canonical nameUT Queue Project PIS031 — Solar in Emery, Utah
Queue IDPIS031
Statuswithdrawn
Source statusWithdrawn
MarketUT
TechnologySolar
Capacity199.0 MW
StateUtah
CountyEmery
Point of interconnectionCamp Williams-Four Corners transmission line
Requested (queue) date2023-04-14
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata