UT Queue Project PIS105 — Solar+Battery in Emery, Utah

UT Queue Project PIS105 — Solar+Battery in Emery, Utah is a 199.0 MW solar+battery interconnection project in Emery, Utah with a current status of active. It is proposed to connect at Huntington-Pinto transmission line.

199.0 MWCapacity
ActiveStatus
UTMarket
Solar+BatteryTechnology

Project facts

Canonical nameUT Queue Project PIS105 — Solar+Battery in Emery, Utah
Queue IDPIS105
Statusactive
Source statusIn Progress
MarketUT
TechnologySolar+Battery
Capacity199.0 MW
StateUtah
CountyEmery
Point of interconnectionHuntington-Pinto transmission line
Requested (queue) date2025-12-18
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.