Utica 230 kV Substation (GEN-2015-089)

Utica 230 kV Substation is a 200.0 MW wind interconnection project in Bon Homme, South Dakota with a current status of operational. It is proposed to connect at Utica 230 kV Substation.

200.0 MWCapacity
OperationalStatus
SDMarket
WindTechnology

Project facts

Canonical nameUtica 230 kV Substation
Queue IDGEN-2015-089
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketSD
TechnologyWind
Capacity200.0 MW
StateSouth Dakota
CountyBon Homme
Point of interconnectionUtica 230 kV Substation
Requested (queue) date2015-10-13
Proposed in-service date
Operational date2017-06-30
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata