Vault Solar (25INR0482)

Vault Solar is a 108.5 MW solar interconnection project in Palo Pinto, Texas with a current status of operational. It is proposed to connect at Tap #331 Rwmiller - #320 Jaybird 138kV .

108.5 MWCapacity
OperationalStatus
Palo PintoMarket
SolarTechnology

Project facts

Canonical nameVault Solar
Queue ID25INR0482
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketPalo Pinto
TechnologySolar
Capacity108.5 MW
StateTexas
CountyPalo Pinto
Point of interconnectionTap #331 Rwmiller - #320 Jaybird 138kV
Requested (queue) date2023-06-28
Proposed in-service date—
Operational date2027-12-31
Withdrawn date—
DeveloperPPM THR Solar
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31phaseSS Completed, FIS Completed, No IASS Completed, FIS Completed, IAlow
2026-08-31ia_signed_date—2026-06-30medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.