Vernal 2 (caiso_c15_445)

Vernal 2 is a 50.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Alpaugh Substation 115kV.

50.0 MWCapacity
WithdrawnStatus
CAISOMarket
SolarTechnology

Project facts

Canonical nameVernal 2
Queue IDcaiso_c15_445
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologySolar
Capacity50.0 MW
StateCalifornia
County
Point of interconnectionAlpaugh Substation 115kV
Requested (queue) date2023-04-17
Proposed in-service date2026-12-01
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerCAISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.