Virgil Fodness 230 kV Sub (GEN-2017-054)

Virgil Fodness 230 kV Sub is a 102.0 MW solar interconnection project in Lincoln County, South Dakota with a current status of withdrawn. It is proposed to connect at Virgil Fodness 230 kV Sub.

102.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameVirgil Fodness 230 kV Sub
Queue IDGEN-2017-054
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity102.0 MW
StateSouth Dakota
CountyLincoln County
Point of interconnectionVirgil Fodness 230 kV Sub
Requested (queue) date2017-05-30
Proposed in-service date
Operational date
Withdrawn date2018-01-12
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.