Vortex BESS (21INR0473)
Vortex BESS is a 121.8 MW other interconnection project in Throckmorton, Texas with a current status of operational. It is proposed to connect at loop 345kV 60515 Clear Crossing - 1421 WillowCr 345kV.
121.8 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Vortex BESS |
|---|---|
| Queue ID | 21INR0473 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Other |
| Capacity | 121.8 MW |
| State | Texas |
| County | Throckmorton |
| Point of interconnection | loop 345kV 60515 Clear Crossing - 1421 WillowCr 345kV |
| Requested (queue) date | 2019-12-02 |
| Proposed in-service date | 2023-09-29 |
| Operational date | 2023-09-29 |
| Withdrawn date | — |
| Developer | AZURE SKY WIND STORAGE LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata