Vulcan Tertius (caiso_c15_396)

Vulcan Tertius is a 517.0 MW solar+battery interconnection project with a current status of withdrawn. It is proposed to connect at Hassayampa 500kV.

517.0 MWCapacity
WithdrawnStatus
CAISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameVulcan Tertius
Queue IDcaiso_c15_396
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologySolar+Battery
Capacity517.0 MW
StateCalifornia
County
Point of interconnectionHassayampa 500kV
Requested (queue) date2023-04-17
Proposed in-service date2026-09-15
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerCAISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.