Wading River Power Station Battery Energy Storage System (BESS) (C24-280)

Wading River Power Station Battery Energy Storage System (BESS) is a 50.0 MW battery interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Wading River 138 kV Substation.

50.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameWading River Power Station Battery Energy Storage System (BESS)
Queue IDC24-280
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity50.0 MW
StateNew York
CountySuffolk
Point of interconnectionWading River 138 kV Substation
Requested (queue) date2024-09-24
Proposed in-service date
Operational date
Withdrawn date
DeveloperNational Grid
Utility / transmission ownerLIPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.