Wagener 115 kV Sub (GEN-2017-055)

Wagener 115 kV Sub is a 228.2 MW solar interconnection project in Lancaster County, Nebraska with a current status of withdrawn. It is proposed to connect at Wagener 115 kV Sub.

228.2 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameWagener 115 kV Sub
Queue IDGEN-2017-055
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity228.2 MW
StateNebraska
CountyLancaster County
Point of interconnectionWagener 115 kV Sub
Requested (queue) date2017-05-28
Proposed in-service date2023-04-01
Operational date
Withdrawn date2021-06-14
Developer
Utility / transmission ownerLES

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata