LES — Interconnection Queue Projects

LES is associated with 13 tracked interconnection projects representing 1,698 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

13Projects
6Active
3Operational
4Withdrawn
1,698 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery61,020 MW
Solar3566 MW
Gas4112 MW

Portfolio by market

MarketProjects
PJM2

Geographic footprint

StateProjects
Nebraska11
Maryland2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
8000 SW 12th (Rokeby) Station, 115kV BusGEN-2021-043Battery250.0 MWactiveLancaster, Nebraska
Wagener 115 kV SubGEN-2017-055Solar228.2 MWwithdrawnLancaster County, Nebraska
Wagener 115kV SubstationGEN-2021-049Solar225.0 MWactiveLancaster, Nebraska
Wagener 115kV SubstationGEN-2026-SR20Battery225.0 MWactiveLincoln, Nebraska
NW 68th - Holdrege 345 kV SubstationGEN-2023-189Battery200.0 MWwithdrawnLancaster, Nebraska
Waverly-Alvo 115 kV LineGEN-2024-051Battery170.0 MWwithdrawnLancaster, Nebraska
Rokeby 115 kV SubstationGEN-2021-034Solar113.0 MWactiveLancaster, Nebraska
84th & Bluff 115kV SubstationERAS-2025-001Gas104.0 MWactiveLancaster, Nebraska
84th/Fletcher 115kV substationGEN-2019-077Battery100.0 MWwithdrawnLancaster, Nebraska
Wagener 115kV SubstationGEN-2021-048Battery75.0 MWactiveLancaster, Nebraska
Terry Bundy Generating Station 115kVGEN-2012-021Gas4.8 MWoperationalLincoln, Nebraska
Millersville LFG58246_CAT1Gas1.6 MWoperationalAnne Arundel, Maryland
Millersville LFG58246_CAT2Gas1.6 MWoperationalAnne Arundel, Maryland

Recent material changes

ObservedProjectFieldOldNew
2026-08-2784th & Bluff 115kV Substationoperational_date2029-01-29
2026-08-2784th & Bluff 115kV Substationstatusoperationalactive
2026-08-2784th & Bluff 115kV Substationproposed_online_date2029-06-01
2026-08-12Waverly-Alvo 115 kV Linestatusoperationalwithdrawn
2026-08-12Waverly-Alvo 115 kV Linewithdrawn_date2026-08-10
2026-08-12Waverly-Alvo 115 kV Lineproposed_online_date2028-05-17
2026-08-12Waverly-Alvo 115 kV Lineoperational_date2028-03-17

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.