Watkins Corner 34.5 kV (AG2-217)

Watkins Corner 34.5 kV is a 20.9 MW battery interconnection project in Southampton, Virginia with a current status of withdrawn.

20.9 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameWatkins Corner 34.5 kV
Queue IDAG2-217
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity20.9 MW
StateVirginia
CountySouthampton
Point of interconnection—
Requested (queue) date2021-03-09
Proposed in-service date2023-04-29
Operational date—
Withdrawn date2024-09-17
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata