Waverly-Alvo 115 kV Line (GEN-2024-051)

Waverly-Alvo 115 kV Line is a 170.0 MW battery interconnection project in Lancaster, Nebraska with a current status of withdrawn. It is proposed to connect at Waverly-Alvo 115 kV Line.

170.0 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameWaverly-Alvo 115 kV Line
Queue IDGEN-2024-051
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity170.0 MW
StateNebraska
CountyLancaster
Point of interconnectionWaverly-Alvo 115 kV Line
Requested (queue) date2024-10-30
Proposed in-service date2028-05-17
Operational date
Withdrawn date2026-08-10
Developer
Utility / transmission ownerLES

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-12statusoperationalwithdrawnhigh
2026-08-12withdrawn_date2026-08-10high
2026-08-12proposed_online_date2028-05-17medium
2026-08-12operational_date2028-03-17medium
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata