Waynesboro-Dooms 115kV (Y1-029)

Waynesboro-Dooms 115kV is a 99.0 MW wind interconnection project in Accomack, Virginia with a current status of withdrawn.

99.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWaynesboro-Dooms 115kV
Queue IDY1-029
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity99.0 MW
StateVirginia
CountyAccomack
Point of interconnection
Requested (queue) date2012-02-29
Proposed in-service date2014-09-15
Operational date
Withdrawn date2012-08-29
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata