Webb County Renewables Solar (24INR0310)

Webb County Renewables Solar is a 203.4 MW solar interconnection project in Webb, Texas with a current status of withdrawn. It is proposed to connect at 161105 Bordas 345kV.

203.4 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameWebb County Renewables Solar
Queue ID24INR0310
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity203.4 MW
StateTexas
CountyWebb
Point of interconnection161105 Bordas 345kV
Requested (queue) date2022-07-24
Proposed in-service date2024-06-01
Operational date
Withdrawn date2024-03-08
DeveloperWebb County Renewables, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata