Welsh-Lydia 345kV Line Break is a 240.0 MW solar interconnection project in Titus, Texas with a current status of withdrawn. It is proposed to connect at Welsh-Lydia 345kV Line Break.

240.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameWelsh-Lydia 345kV Line Break
Queue IDGEN-2021-055
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity240.0 MW
StateTexas
CountyTitus
Point of interconnectionWelsh-Lydia 345kV Line Break
Requested (queue) date2021-04-29
Proposed in-service date2026-12-31
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata