Titus County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Titus, Texas, representing 1,959 MW of requested capacity.
6Total projects
1Active
2Operational
3Withdrawn
1,959 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 1,116 MW |
| Battery | 3 | 603 MW |
| Solar | 1 | 240 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Welsh | 6139_1 | Other | 558.0 MW | operational | Titus, Texas |
| Welsh | 6139_3 | Other | 558.0 MW | operational | Titus, Texas |
| Welsh-Lydia 345kV Line Break | GEN-2021-055 | Solar | 240.0 MW | withdrawn | Titus, Texas |
| Wekiva Grid | 23INR0067 | Battery | 202.6 MW | withdrawn | Titus, Texas |
| Petty to Chapel 138 kV Line | GEN-2023-227 | Battery | 200.0 MW | withdrawn | Titus, Texas |
| Welsh 345kV Substation | GEN-2021-038 | Battery | 200.0 MW | active | Titus, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Wekiva Grid, LLC | 1 | 203 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Titus County.