West Queue Project 1113 — Solar in Emery, Utah

West Queue Project 1113 — Solar in Emery, Utah is a 2.8 MW solar interconnection project in Emery, Utah with a current status of withdrawn. It is proposed to connect at Riverdale-Farmington B transmission line (Tap to Hill AFB) at 138 kV.

2.8 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameWest Queue Project 1113 — Solar in Emery, Utah
Queue ID1113
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity2.8 MW
StateUtah
CountyEmery
Point of interconnectionRiverdale-Farmington B transmission line (Tap to Hill AFB) at 138 kV
Requested (queue) date2019-02-15
Proposed in-service date2019-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata