West Queue Project 279 — Hydro in Hood River, Oregon

West Queue Project 279 — Hydro in Hood River, Oregon is a 4.8 MW hydro interconnection project in Hood River, Oregon with a current status of withdrawn. It is proposed to connect at Powerdale - Woody Gutherie Line.

4.8 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology

Project facts

Canonical nameWest Queue Project 279 — Hydro in Hood River, Oregon
Queue ID279
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyHydro
Capacity4.8 MW
StateOregon
CountyHood River
Point of interconnectionPowerdale - Woody Gutherie Line
Requested (queue) date2009-06-30
Proposed in-service date2011-01-01
Operational date
Withdrawn date2015-06-02
DeveloperFarmers Irrigation District
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata