West Queue Project 417 — Hydro in Sanpete, Utah
West Queue Project 417 — Hydro in Sanpete, Utah is a 1.4 MW hydro interconnection project in Sanpete, Utah with a current status of withdrawn. It is proposed to connect at Nebo-Gunnison, Manti City Tap.
1.4 MWCapacity
WithdrawnStatus
WestMarket
HydroTechnology
Project facts
| Canonical name | West Queue Project 417 — Hydro in Sanpete, Utah |
|---|---|
| Queue ID | 417 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Hydro |
| Capacity | 1.4 MW |
| State | Utah |
| County | Sanpete |
| Point of interconnection | Nebo-Gunnison, Manti City Tap |
| Requested (queue) date | 2012-03-19 |
| Proposed in-service date | 2012-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata