Sanpete County, Utah — Interconnection Projects
The interXdata warehouse tracks 14 interconnection projects in Sanpete, Utah, representing 1,381 MW of requested capacity.
14Total projects
0Active
7Operational
7Withdrawn
1,381 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 2 | 1,000 MW |
| Solar+Battery | 1 | 300 MW |
| Solar | 3 | 62 MW |
| Other | 7 | 18 MW |
| Hydro | 1 | 1 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| PACE Queue Project C2-20 — Battery in Sanpete, Utah | C2-20 | Battery | 500.0 MW | withdrawn | Sanpete, Utah |
| PACE Queue Project C3-064 — Battery in Sanpete, Utah | C3-064 | Battery | 500.0 MW | withdrawn | Sanpete, Utah |
| PACE Queue Project C4-043 — Solar+Battery in Sanpete, Utah | C4-043 | Solar+Battery | 300.0 MW | withdrawn | Sanpete, Utah |
| West Queue Project 822 — Solar in Sanpete, Utah | 822 | Solar | 30.0 MW | withdrawn | Sanpete, Utah |
| UT Queue Project PIS020 — Solar in Sanpete, Utah | PIS020 | Solar | 30.0 MW | withdrawn | Sanpete, Utah |
| West Queue Project 404 — Other in Sanpete, Utah | 404 | Other | 11.8 MW | withdrawn | Sanpete, Utah |
| Hydro Plant No 3 | 925_3 | Other | 2.1 MW | operational | Sanpete, Utah |
| Gunnison Solar | 65618_524 | Solar | 1.5 MW | operational | Sanpete, Utah |
| West Queue Project 417 — Hydro in Sanpete, Utah | 417 | Hydro | 1.4 MW | withdrawn | Sanpete, Utah |
| Unit 4 | 7015_1 | Other | 1.3 MW | operational | Sanpete, Utah |
| Manti Upper | 3676_HC2 | Other | 1.0 MW | operational | Sanpete, Utah |
| Hydro Plant No 3 | 925_2 | Other | 0.7 MW | operational | Sanpete, Utah |
| Manti Lower | 1020_HC1 | Other | 0.6 MW | operational | Sanpete, Utah |
| Manti Lower | 1020_2 | Other | 0.6 MW | operational | Sanpete, Utah |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| PacifiCorp | 1 | 30 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Sanpete County.