West Queue Project 778 — Solar+Battery in Emery, Utah
West Queue Project 778 — Solar+Battery in Emery, Utah is a 200.0 MW solar+battery interconnection project in Emery, Utah with a current status of operational. It is proposed to connect at Emery substation.
200.0 MWCapacity
OperationalStatus
WestMarket
Solar+BatteryTechnology
Project facts
| Canonical name | West Queue Project 778 — Solar+Battery in Emery, Utah |
|---|---|
| Queue ID | 778 |
| Status | operational |
| Source status | operational |
| Market | West |
| Technology | Solar+Battery |
| Capacity | 200.0 MW |
| State | Utah |
| County | Emery |
| Point of interconnection | Emery substation |
| Requested (queue) date | 2016-07-13 |
| Proposed in-service date | 2024-08-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Hornshadow Solar II, LLC |
| Utility / transmission owner | PacifiCorp |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata