West Queue Project 80 — Wind in Rich, Utah

West Queue Project 80 — Wind in Rich, Utah is a 240.0 MW wind interconnection project in Rich, Utah with a current status of withdrawn. It is proposed to connect at Birch Creek - Ben Lomond OR Naughton - Ben Lomond.

240.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 80 — Wind in Rich, Utah
Queue ID80
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity240.0 MW
StateUtah
CountyRich
Point of interconnectionBirch Creek - Ben Lomond OR Naughton - Ben Lomond
Requested (queue) date2006-05-08
Proposed in-service date2008-09-01
Operational date
Withdrawn date
DeveloperIberdrola Renewables, Inc.
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata